Production
capabilities
We have highly qualified personnel to provide a timely and quality response to our customers at a lower cost.
Assembly Holder
1400 pieces per week
Electric Holder
400-500 pieces per week
Electropneumatic Modules
50-70 pieces per week
Test Board
1 Test Board per first 4 weeks. subsequently 1 per week
We are backed by the following equipment:
- 6 Machining centers
- 4 Milling machines
- 2 Grinding machines
- 2 Lathes
- 3 Assembly areas
- 1 quality system
- Programming centers
- Automation area
- 3 Commercial areas of sales
- Welding area
- Stations of Design
We invite you to view the videos of some of our products in operation:
Holder push back test
Rotary operation 2
Electro-pneumatic module
Rotary Operation
-
Holder push back test
-
Rotary operation 2
-
Electro-pneumatic module
-
Rotary Operation